President Tinubu is set to attend the Ground-breaking of Gwagwalada Power Project today, 4th August 2023. This is the first of three (3) major power plants (Abuja, Kaduna and Kano, with more than 4,000MW combined capacity) to be powered by gas from the AKK Pipeline.
AKK was/is one of former President Muhammadu Buhari’s signature projects in this “Decade of Gas”.